Two years and counting.
Verifiable milestones from incorporation through Phase 3 target. Each entry tied to a date, an artefact, and a category (Founding · Engineering · Doctrine · External · Press).
- 01 / 102024-05-27Founding
Company incorporated
UAM Korea Tech Co., Ltd. registered in Seoul, Republic of Korea. Founder Park Moojin opens with a singular thesis: encode allied IPB doctrine in catalog primitives.
- 02 / 102024-12-29External
Muan accident · 7C2216
Jeju Air flight 7C2216 collides with birds during approach to Muan International Airport, killing 179 — deadliest civilian aviation accident in Korean history. The schema gap that would have flagged the threat had never been in the operator's catalog.
- 03 / 102026-03-23Engineering
AVIX-AI V5.1 schema submission
`platform_type: Animal` schema submitted to Anduril Developer Zone (Sent ID FMfcgzQgLPSDPNVTfVzPMpntljFwkBrV). Rationale: catalog gap, four-century arc, doctrine-tagged response.
- 04 / 102026-04-20Engineering
19/19 HTTP 200 demonstration
Incheon Technopark notice 2026-177 demonstration · commit fbcb327 · 19/19 entity API submissions returned HTTP 200 across the test corpus. The reproducibility baseline.
- 05 / 102026-04-24External
Lattice catalog adoption
Anduril Lattice Dashboard April 2026 release ships `platform_type: Animal` and `aliases.name: Bird (Species)` natively. The submission becomes precedent for the partner namespace pattern.
- 06 / 102026-04-26Press
V2.3 site narrative pivot
uamkt.com narrative restructured from product-tile-first to story-first per CEO direction (V2.3 spec). Scaffolds the editorial discipline the Phase 1 launch will inherit.
- 07 / 102026-04-30Doctrine
BD package + dev spec issued
Anduril John BD package finalised; UAMKT-SITE-DEVSPEC-V1 published, beginning the codebase rebuild on Next.js 14 + Anduril/Helsing visual language.
- 08 / 102026-05-30Engineering
Phase 1 MVP launch
Codebase ready · 14 Phase 1 spec pages live · Lighthouse-ready · Vercel deploy gated only on CEO DNS swap. Sprint 1-6 complete in 30 days.
- 09 / 102026-06-30Engineering
Phase 2 expansion (target)
+15 spec pages — Solutions detail, Technology detail, Software full pages, Company expansion (Leadership / Compliance / Channels), Insights expansion (Whitepapers / Research), Newsroom (In the News).
- 10 / 102026-07-31Engineering
Phase 3 + i18n (target)
Investors / Timeline / API docs / Careers / Resources expansion + formal `/ko/` Korean translations via next-intl.